4inch (100mm) Rubber Hose & Poly Pipe Bauer Assemblies for a Tasmanian Bridge Construction
4inch (100mm) Rubber Suction Hose & Poly Pipe lengths in 12m fitted with Galvinised Bauer Fittings for Water Transfer and Dewatering heading to Tasmania for a Bridge Construction Project.
4inch (100mm) Rubber Hose & Poly Pipe Bauer Assemblies for Site Dewatering & Water Transfer
4inch (100mm) Poly Pipe lengths in 6m & 12m fitted with Galvinised Bauer Fittings for Water Transfer and Dewatering on Sydney Tunnel Constructions Sites
300meters of 4inch Rubber Suction Hose Fitted with Bauer Fittings for Melbourne Tunnel Construction
4” (100mm) Heavy Duty Rubber Suction Hose with Bauer Fittings heading heading to Melbourne for Tunnel Construction Sites.
NSW Quarry Site Dewatering Hoses – 4inch (100mm) Heavy Duty Rubber Suction with Bauer Fittings
4” (100mm) Heavy Duty Rubber Suction Hose with Bauer Fittings heading to a Quarry in NSW Central West for Site Dewatering.
4inch (100mm) Heavy Duty Rubber Water Suction Hose with Galvinised Bauer Fittings for NSW Quarry Site.
4” (100mm) Heavy Duty Rubber Suction Hose with Bauer Fittings heading to a Quarry on NSW South Coast for Site Dewatering.
1 1/2 (38mm) Alfagomma 202 Rubber Water Suction Hose Assemblies for NSW Mine Site Water Delivery
1 1/2 (38mm) Alfagomma 202 Rubber Water Suction Hose in 18m lengths Crimped with Stainless Steel Male BSP Ends for a Mine Site Water Delivery Project.
4inch (100mm) Poly Pipe Bauer Assemblies for Site Dewatering & Water Transfer in Sydney Tunnels
4inch (100mm) Poly Pipe lengths in 6m & 12m fitted with Galvinised Bauer Fittings for Water Transfer and Dewatering on Sydney Tunnel Constructions Sites
4inch (100mm) Flanged Bauers Fittings and Flanged Tee Piece Assemblies for Brisbane Piling Project
A Project Supply Package for an upcoming Batching Plant Setup on a Project in QLD.
-Rubber Suction and Delivery Hose Assemblies with Bauer Couplings
-Bauer Tee Connection Manifolds
-Bauer and Butterfly Valve Sets
4inch (100mm) Butterfly Valves with Male & Female Galvinised Bauers for a Sydney Tunnelling Site.
4inch (100mm) Flanged Bauer Butterfly Valves assemblies heading out to a Sydney Tunnel Dewatering Project.
4inch (100mm) Dewatering Layflat, Suction Hose, Bauers and Foot Valves for Wollongong Quarrying firm.
4inch (100mm) Dewatering Layflat, Suction Hose, Bauers and Foot Valves for Wollongong Quarrying firm.