4inch (100mm) Rubber Hose & Poly Pipe Bauer Assemblies for Site Dewatering & Water Transfer
4inch (100mm) Poly Pipe lengths in 6m & 12m fitted with Galvinised Bauer Fittings for Water Transfer and Dewatering on Sydney Tunnel Constructions Sites
4 inch (100mm) Heavy Duty Black Layflat Hose Kits Fitted with Alloy Camlocks for NSW Regional Council
4 inch (100mm) Heavy Duty Black Rubber Layflat Hose fitted with Aluminium Camlock Couplings heading out to a Western NSW Council in Pipeline Bypass work.
4 inch (100mm) Heavy Duty Black Layflat Hose Kits Fitted with Crimped Galvinised Bauers for Quarry Dewatering
4 inch (100mm) Heavy Duty Black Rubber Layflat Hose fitted with Crimped Galvanised Bauer Couplings heading out to a quarry dewatering project on NSW South Coast.
4inch (100mm) Poly Pipe Bauer Assemblies for Site Dewatering & Water Transfer in Sydney Tunnels
4inch (100mm) Poly Pipe lengths in 6m & 12m fitted with Galvinised Bauer Fittings for Water Transfer and Dewatering on Sydney Tunnel Constructions Sites