4inch (100mm) Poly Pipe Bauer Assemblies for Site Dewatering & Water Transfer in Sydney Tunnels
4inch (100mm) Poly Pipe lengths in 6m & 12m fitted with Galvinised Bauer Fittings for Water Transfer and Dewatering on Sydney Tunnel Constructions Sites
4inch (100mm) Flanged Bauers Fittings and Flanged Tee Piece Assemblies for Brisbane Piling Project
A Project Supply Package for an upcoming Batching Plant Setup on a Project in QLD.
-Rubber Suction and Delivery Hose Assemblies with Bauer Couplings
-Bauer Tee Connection Manifolds
-Bauer and Butterfly Valve Sets
4inch (100mm) Butterfly Valves with Male & Female Galvinised Bauers for a Sydney Tunnelling Site.
4inch (100mm) Flanged Bauer Butterfly Valves assemblies heading out to a Sydney Tunnel Dewatering Project.
4inch (100mm) Dewatering Layflat, Suction Hose, Bauers and Foot Valves for Wollongong Quarrying firm.
4inch (100mm) Dewatering Layflat, Suction Hose, Bauers and Foot Valves for Wollongong Quarrying firm.
Rubber Water & Air Hoses for Sydney Tunnel Construction
2inch (50mm) Water Delivery Hose with Camlock and Yellow Air/Water Hoses with Claw Fittings for Sydney Tunnelling Project.
8inch (200mm) Heavy Duty Black Layflat Hose Kits with Bauers for mine site dewatering
8 inch (200mm) Heavy Duty Black Rubber Layflat Hose fitted with Galvanised Bauer Couplings heading out to a mine site dewatering project.
Heavy Duty Black Layflat Hose Kits with Bauers for Sydney Dewatering
6 inch Heavy Duty Black Rubber Layflat Hose fitted with Galvanised Bauer Couplings heading out to a flooded construction site in Sydney’s west.