Poly Pipe fitted with Bauer Fittings, Butterfly Valves & Suction Hose for Gold Coast Piling Project
Another project of 4inch (100mm) Poly Pipe lengths in 6m lengths fitted with Galvanised Bauer Fittings, Butterfly Valves, Bauer Manifolds and Suction Hose Kits heading to Piling Project on the Gold Coast QLD.
4inch (100mm) Poly Pipe fitted with Galvanised Bauer Fittings for Melbourne Tunnelling Project
Final batch of 4inch (100mm) Poly Pipe lengths in 12m fitted with Galvanised Bauer Fittings heading to Melbourne Tunnel Construction Project.
3inch Rubber Suction Hose Fitted with Camlocks Fittings for a Melbourne based Drilling Company
3” (75mm) Heavy Duty Rubber Suction Hose with Camlock Fittings & Stainless Steel Bandit Clamps for Melbourne for Drilling Projects.
4inch (100mm) Rubber Hose & Poly Pipe Bauer Assemblies for a Tasmanian Bridge Construction
4inch (100mm) Rubber Suction Hose & Poly Pipe lengths in 12m fitted with Galvinised Bauer Fittings for Water Transfer and Dewatering heading to Tasmania for a Bridge Construction Project.
4inch (100mm) Rubber Hose & Poly Pipe Bauer Assemblies for Site Dewatering & Water Transfer
4inch (100mm) Poly Pipe lengths in 6m & 12m fitted with Galvinised Bauer Fittings for Water Transfer and Dewatering on Sydney Tunnel Constructions Sites
300meters of 4inch Rubber Suction Hose Fitted with Bauer Fittings for Melbourne Tunnel Construction
4” (100mm) Heavy Duty Rubber Suction Hose with Bauer Fittings heading heading to Melbourne for Tunnel Construction Sites.
NSW Quarry Site Dewatering Hoses – 4inch (100mm) Heavy Duty Rubber Suction with Bauer Fittings
4” (100mm) Heavy Duty Rubber Suction Hose with Bauer Fittings heading to a Quarry in NSW Central West for Site Dewatering.
4inch (100mm) Heavy Duty Rubber Water Suction Hose with Galvinised Bauer Fittings for NSW Quarry Site.
4” (100mm) Heavy Duty Rubber Suction Hose with Bauer Fittings heading to a Quarry on NSW South Coast for Site Dewatering.
4inch (100mm) Poly Pipe Bauer Assemblies for Site Dewatering & Water Transfer in Sydney Tunnels
4inch (100mm) Poly Pipe lengths in 6m & 12m fitted with Galvinised Bauer Fittings for Water Transfer and Dewatering on Sydney Tunnel Constructions Sites
4inch Flanged Bauers for Sydney Piling Project
Bauer Dewatering Fittings Australia.
4inch (100mm) Flanged Bauer Couplings heading out on a urgent delivery for a Piling company in Sydney.